Hot Filling And Cooling Production Line
The process for this machine begins with manual placement of bottles onto the infeed conveyor, followed by automatic infeed and hot filling. The bottles are then cooled and set in a cooling tunnel (two 12-meter sections, 45P) before automatic discharge. Subsequent steps include manual capping, manual labeling, steam heat shrinking, and drying; the bottles are…

